Drip Edge Calculator

Calculate the linear feet and pieces of drip edge flashing needed for your roof perimeter.

Ad — 728x90 — Leaderboard
Enter Your Measurements
Ad — 336x280 — Rectangle

How to Use This Calculator

  1. 1Measure all eave edges plus all rake edges.
  2. 2Enter drip edge piece length (standard 10 ft).
  3. 3Click Calculate.
Ad — 728x90 — Mid-Page

About This Material

Drip edge is a metal flashing installed at the roof eaves and rake edges to direct water away from the fascia and into the gutters. Required by code for all shingled roofs.

Installation Tips

  • Install eave drip edge BEFORE underlayment, rake drip edge AFTER underlayment.
  • Overlap pieces by 2 inches minimum.
  • Nail every 12 inches.

Common Mistakes to Avoid

  • Installing rake drip edge before underlayment — underlayment must lap over rake drip edge.
  • Not overlapping pieces enough, allowing water infiltration.